1.
Musa RS, Azzat NN, Muhammad G, Sulistyawati DR, Lofian B. Implementation of the Earliest Due Date Method in Sample Production Scheduling of Cushion Products at PT XYZ. Metode [Internet]. 2026 Mar. 31 [cited 2026 May 13];12(1):108-21. Available from: https://www.ejournal.um-sorong.ac.id/index.php/metode/article/view/5289